WS2300 LaCrosse

I’m just putting this station together (Wired) and would be grateful if any one has any tips like “How high above the roof line should the anometer be”
And should I be filling some of the holes with silicon sealer to stop water ingress. etc etc.

Many thanks

Woolfy in Dalgety Bay, Scotland

Try this link
http://www.beals5.com/wx/accuracy.htm

You may find useful links for siting of sensors on this page.
http://www.wxqa.com/resources.html
Good luck with your station. :slight_smile: